Ditched £16m Tube project left stations unstaffed

Tube union RMT reveals £16 million cost of botched project which has left dozens of stations dangerous and unstaffed

Tube union RMT today revealed through an FOI request the astronomical waste of nearly £16 million on a system meant to enhance staff rostering but which has left dozens of LU stations dangerous and ‎unstaffed.

The system called RCT – Rostering and Coverage Tool – was introduced to replace the method used by which staff were allocated duties. LUL went ahead with the RCT despite strong representations from RMT and many managers who said that it was not cost effective, not needed, and simply wouldn’t work.

In August , London Underground Limited (LUL) announced the RCT project was to be permanently withdrawn.

This has taken place against a back drop of stations on a daily basis having no staff – sometimes for whole traffic days – because of a general freeze on overtime and farcically slow recruitment of station staff.

The RCT was also linked to the mass job losses of vital station administrators. RMT demands these positions are re-instated .

RMT General Secretary Mick Cash said:

“Despite RMT reps and managers pointing out from a very early stage that the RCT was a waste of money that wouldn’t work, LUL bosses ploughed ahead with this expensive failure.

“Instead of wasting public money on useless and unnecessary systems , LUL would be better served investing money – in this case nearly £16 million – on ensuring all stations are staffed throughout the day and ensuring members of the public have the safe service they deserve.”

> RMT National News

Thursday, 21st May
RMT seeks answers and protections regarding the impact of Covid-19 on BAME workers in the transport sector.
Thursday, 21st May
RMT responds to new rail performance data that shows our railways need fundamental reform.
Tuesday, 19th May
RMT General Secretary Mick Cash said:
Monday, 18th May
As increased rail service timetable comes into place today RMT calls for new compulsory Covid-19 protections for passengers and rail workers.
Monday, 18th May
RAIL UNION RMT is to ballot members on Heathrow Express for industrial action after workers who are currently furloughed due to the Covid-19 crisis were threatened with unemployment.