Ditched £16m Tube project left stations unstaffed

Tube union RMT reveals £16 million cost of botched project which has left dozens of stations dangerous and unstaffed

Tube union RMT today revealed through an FOI request the astronomical waste of nearly £16 million on a system meant to enhance staff rostering but which has left dozens of LU stations dangerous and ‎unstaffed.

The system called RCT – Rostering and Coverage Tool – was introduced to replace the method used by which staff were allocated duties. LUL went ahead with the RCT despite strong representations from RMT and many managers who said that it was not cost effective, not needed, and simply wouldn’t work.

In August , London Underground Limited (LUL) announced the RCT project was to be permanently withdrawn.

This has taken place against a back drop of stations on a daily basis having no staff – sometimes for whole traffic days – because of a general freeze on overtime and farcically slow recruitment of station staff.

The RCT was also linked to the mass job losses of vital station administrators. RMT demands these positions are re-instated .

RMT General Secretary Mick Cash said:

“Despite RMT reps and managers pointing out from a very early stage that the RCT was a waste of money that wouldn’t work, LUL bosses ploughed ahead with this expensive failure.

“Instead of wasting public money on useless and unnecessary systems , LUL would be better served investing money – in this case nearly £16 million – on ensuring all stations are staffed throughout the day and ensuring members of the public have the safe service they deserve.”

> RMT National News

Friday, 25th September
RMT steps up campaign for TfL funding with petition launch
Friday, 25th September
RMT responds to MSPs safety concerns on Scotland’s railway caused by staff vacancies and redundancies.
Friday, 25th September
Outrage as Trump Turnberry ignores union and presses on with savage cuts and job losses.
Thursday, 24th September
A plaque to commemorate the memory of British Rail guard Asquith Xavier who broke the colour bar at Euston station in 1966 will be unveiled in the waiting Room at Platform 1 Chatham Station in Kent today - Thursday 24th September 2020 - at Noon.
Thursday, 24th September
RMT responds to statistics that show a record breaking fall in rail freight during the Covid-19 crisis.